Infrastructure Kurumoch International Airport
1 infrastructure
1.1 terminal a
1.2 vip terminal
1.3 runways/other
infrastructure
kurumoch s main entrance , check-in desks
the space styled interior of airport.
today, airport consists of 2 runways, 1 cargo terminal, 1 vip terminal (departure , arrivals), , 2 airport facilities. kurumoch has 50 parking slots various types of aircraft. airport can handle 19 aircraft @ particular time.
terminal a
also known main terminal , departure building, terminal used facility of entire airport. terminal finished construction in 1993, underwent major renovations in 1998 , 2004. building 11,340 m² , consists of 3 floors: underground floor, floor 1 , floor 2. main terminal serves departure international , domestic flights (including baggage handling departure flights) , air traffic control tower. additionally, of jsc international airport kurumoch s offices located in terminal a. altogether, terminal has capacity of 750 passenger per hour. domestic zone has capacity of 600 passengers per hour, whilst international terminal can handle 150 passengers per hour.
renovations within terminal have been made spring 2014. floor 1 consists of 8 check-in desks domestic departures , 6 international , domestic departure lounge. floor 2 has variety of air company offices, international departure zone , staff rooms.
vip terminal
the business terminal built in 2004. can handle 50 passengers per hour. business terminal offers private check-in desks , lounge area standard entertainment systems. kurumoch offers business class personnel ride aircraft separate buses.
runways/other
the airport contains 2 runways, @ moment used runway equipped ils equipment , certified category ils license. used runway 3,001mx55m , made of asphalt. second runway 2,548x50m , made of concrete, under reconstruction. cargo terminal can handle 200 tonnes per hour , 3,758 m².
Comments
Post a Comment